Project Name
Humber Treatment Plant
Owner
City of Toronto
Prime Consultant
MacViro Consultants Inc.
Description
The construction of this new effluent water filtration plant involved the provision of a pre-engineered building, filtration system complete with backwash, backwash effluent pumps, high and low unfiltered effluent water pumps, treated high lift pumps. Yard piping along with related piping and new instrumentation and control systems throughout the plant were included in the scope of work.